Place of Origin : Zhangzhou,China
Post Date : 13-01-2014
Expiry Date : 13-02-2015
Installation Instruction:
Make The Flange Right Position To Its Corresponding Mounting Holes, And Get Screws Pass Through The Flange Holes, Then Tighten The Nut With A Wrench.
€¢ Do Not Over The Displacement Limit Of The Single-ball Rubber Joint During Installation.
€¢ Evenly Mounting The Bolts, Gradually Tighten The Bolts To Prevent Partial Leakage.
€¢ A Flexible Pressure Pad Shall Be Used For The Working Pressure Over 1.6MPa To Prevent Loose Bolts During Operation.
€¢ Force Supports Are Necessary At Both Ends Of The Vertical Pipe Installation, Use Anti-pull-off Devices To Prevent Pressure Pull-off.
€¢ Keep Away From Heat/fire Or Ozone Region, Using Non Working Media Or Exposed To Strong Sunlights Is Strictly Prohibited.
€¢ Keep Away From Sharp Materials During Transport Or Storage.
Http://www.tyrubberjoint.com
Http://www.tyexpoansionjoint.com
Email:admin@tyexpansionjoint.com