Place of Origin : jiangsu,China
Post Date : 08-06-2020
Expiry Date : 20-07-2028
TECON Dam Formwork DB180/240 Is With High Dependability And Loading Capacity For Mass Concrete Structures Without Tie Rod To Pull Through. It Is Widely Used For Forming One-sided Construction Projects, Such As Dams, Run-off River Power Stations Or Navigation Locks.
Features Of Dam Formwork DB180/240
High Load Capacity Without Tie Rod To Pull Through Concrete Structure
Can Produce Both Single Side Wall And Double Side Wall Inclined
Shorten Crane Time Due To One Unit Design Of Dam Formwork
Reliable Anchorage System And Strong Bracket Strength Ensures Highest On Site Safety
Can Be Compatible With BASE 20 Formwork, HETO Frame Formwork Etc.
Specification Of Dam Formwork DB180/240
Two Pieces Of Dam Formwork Climbing Bracket Together With TECON Wall Formwork Section Can Be Assembly Into One Complete Unit For Crane Lift
No Tie Rods Needed To Pull Through The Wall
Items Technical Details
Available Incline Degree ±45°
Width Of The Formwork 2.2m/2.4m
Maximum Pouring Height 4m
Power Unit Tower Crane
Required Crane Lifting Power 30kN/unit
Distance Of Retrusion 45cm
Anchor Point Load Capacity 22kN
Application Of Dam Formwork DB180/240
One-sided Construction Projects Such As Dams, Run-off River Power Stations And Navigation Locks
Related Formwork Of Dam Formwork DB180/240
TECON Climbing Formwork CB180/240, TECON Self-climbing Formwork TSC50/100, TECON Multi-function Climbing Formwork MB180