Place of Origin : Hangzhou,China
Delivery Time : 15-20 Days
Payment Terms : T/T, L/C, D/P, D/A
1) The fabric rolls are transported by the Inlet Conveyor to the Main Packing Unit for both width and side sealing through polythene film.
2) The width and diameter of the coming rolls are detected by the intelligent photoelectric sensors and optical fibers so as to ensure there will be no polythene film wastage during packing.
3) On the completion of side sealing, the packed fabric rolls are transferred to the Heat Chamber so as to crimp the polythene tightly over the fabric roll.