Place of Origin : Xinxiang,China
Delivery Time : Within 45 Days After Receving Your Deposite
Payment Terms : T/T, L/C, Western Union
"It is composed with girder frame, crane travel device, and the trolley with lifting and moving device. There is pave the rail for the trolley moves on the main girder.
Assemble the moving table on the outside of the two main girder, one side is prepare for assemble and maintenance the crane move device,another side is prepare for assemble of the trolley conductor device.
There are full field of view cabin suspend under the main girder, there are joint control desk or single control box pac