Place of Origin : Dezhou,China
Delivery Terms : 50 -80 Days
Product Capacity : 50L To 5000L
Payment Terms : T/T
Material: SUS 304
Effective volume: 50L to 5000L
Working pressure: 2 bar
Jacket working pressure: 1 bar
Inside thickness: 3mm, outer cladding thickness: 2mm
Domed top, 60 degree cone angle
Cylinder and cone cooling jacket
CIP arm, diaphragm pressure gauge, pressure regulator
Dry hopping port, PVRV on top
Side Manhole, racking arm installed
Stainless steel legs with adjustable leg bolt
Yucheng Zeyu Machinery Is Company Specialized In Equipment For Brewing And Soft
drinks Industry. The Company Is Specialized In Equipment And Consultancty For Small To Medium Sized Customers All Over The World. A Track Record Of Successful Projects
demonstrates The Competence Of Its Expertise.
Yucheng Zeyu Machinery Would Be Very Pleased To Offer The Following Service And
products:
Turnkey Brewery Projects
Microbrewery Plants
Pub Brewery Plants.
Individual Equipment Items For Beer Brewing, Filling And Beer Tap Systems.
For All Products As Mentioned Above Yucheng Zeyu Machinery Is Happy To Offer On-site Installation Service If Requested By The Customer.
Our Beer Brewery Equipment Is Carefully Manufactured And Tailored Specifically To Each Of Our Customers`needs. We Offer A Wide Array Of Beer Brewery Equipment That
will Accommodate Any Budget Or Production Goal That Each Customer Might Have.
Product Instruction For Your Reference:
Beer Brewery Machine System
(Can Be Customized)
Packaging & Delivery
1.LCL/FCL(20GP/40GP/40HQ)
2.Packed With Plastic Film In Fumigation Free Wooden Case Or Fixed With Iron Frame
3.Up To Export Standard, Suitable For Delivery
4.Customer's Requirements Available
5.Terms Of Payment: 50% T/T Deposit, 50% T/T.
6.Time Of Shipment:30 Days Since Receipt Of Payment.
Installation Instruction:
1. Electrical Parts Fit The Local Power Requirement.
Yucheng Zeyu Machinery Co, Ltd.
2.Since It Is A Little Noisy During Working, It Is Better To Install The Chiller Outside.
3. Better To Install The Mill In A Separate Milling Room.
4. If Necessary, There Will Be A Steam Condenser Assorted With Brew House, To Avoid
the Steam Problem In The Room.
5.If Customer Needs, We Can Appoint Our Engineer For The Installation. Installation
time: 30 Days, For 1 Engineers. The Work Including Equipment Installation, Training And Brewing The First Batch Of Beer.
6. Customer Affords The Air Tickets Cost, Insurance, Food And Accommodation.