Aluminum formwork is used for building, according to structure drawing and construction drawing we can design and know how many formwork needs, then we can produce accordingly. First set up formwork first, then pour concrete into the formwork, after 24 to 36 hours the concrete will be dry, then formwork will be dismantled for next house or floor, normally 4 to 5 days one floor will be ready.