Place of Origin : Shijiazhuang,China
Delivery Time : Within 40 Days
Payment Terms : L/C,D/A,D/P,T/T,MoneyGram
Products details:
1. total system forms the complete concrete structure
2. convenient
3. easy operation
4. high quality
5. light and great flexibitity
6. durable, made of special alloy aluminum
7. no need for rehabilitation, no risk of rust and corrosion
8. fast installation owing to its special design
9. speed of construction-4-days each floor construction cycle.
10. Formwork can be re-used over 300 times.
11. No tower cranes required to lift the formwork from floor to floor