3D Panels - Product
Place of Origin : Anping,China
Product Description
3D Wire Panels are one new type welded wire mesh products, mainly used in construction. 3D Wire Mesh Panels with features of tensile and easy installation are popular.
Basic Information
Brand : Winner
Material : Galvanized Steel Wire, PVC Coated Iron Wire In Blue, Green, Yellow And Other Colors
Physical Specification
Other Specification : 3D Panel Is A Prefabricated Three Dimensional Lightweight Structural Panel Consisting Of A Super-insulated Polystyrene Core Sandwiched Between Two Engineered Layers Of 10 Ga Steel Welded Wire Fabric Mesh. To Complete The Panel Form Process A 10 Ga Steel Wire Truss Is Pierced Completely Through The Polystyrene Core And Welded To Each Of The Outer Layer Sheets Of 10 Ga Steel Welded Wire Fabric Mesh.
3D Panel Is A New Wire Mesh Products, Mainly Used In Construction. It's High Tensile And Is Easy To Install And These Features Make 3d Wire Mesh Panels Very Popular By World Construction Customers.
Construction Process Of 3D Panels:
1. After Setting Up The Fixed Metallic Materials Upon The Foundation Concrete, The Panel Is To Be Between Stabilized.
2. Tie Up The Connecting Line Of #22, Every Kind Of Strengthened Mesh Between Concrete And Panel, Panel And Panel.
3. Lay Under The Ground The Essential Electrical Pipes And All Types Of Arrangements Pipe.
4. Finish With The Examination To The Assemblage, Horizontality And Verticality, Reinforcement And Pipe Arrangement Status.
5. Finish The Global Body With The First Time Mechanism Of Spraying Cement Mortar, And With The Second Time Hand Plastering Of Skimming Coating.
6. It Can Be Finalized With Every Type Of Materials In Correspondence To Its Usage Like Pitching, Tiling, Marbling, Paper Hanging, Painting Etc.
7. If Used For More Than Second Floor Building, The Construction Procedure Is Like This: 1 Assemble The Lower Part Wall, 2 Lay Down The Foundation Concrete, 3 Assemble The Upper Part Wall, 4 Mechanical Plastering On The Lower Part, 5 Spraying After Laying Down The Foundation Concrete On The Upper Part.