Place of Origin : Shenzhen,China
Post Date : 13-12-2019
Expiry Date : 28-11-2030
2k Mould Specification
Part Function: Water Plastic Manifold
Part Material: PP & TPE
Shrinkage: 1.6%
Cavity: 1 Cavity
Mould Base: 1.1730
A B Plate: 2312
Cavity Steel: ASSAB 8407
Cycle Time: 50’s
Life Cycle: 500,000 Shots
Gate: Hot Tip On Part, Part Removal With Robot
Lead Time: 55 Working Days After Deposit
Payment: 40% Deposit, 30% After First Of Trial, 30% Before Shipping
HanKing Mould Enginering Ltd. Designs And Manufacturing Plastic Injection Molds For Our Worldwide Customers, Also Provide Service For Injection Molding Production, Including Second Process And Assembly If The Customer Needed. We Sincerely Invite And Welcome People From All Around The World To Invest And Create More Values Together.