PP Precision Plastic Mold - Product
Place of Origin : Dongguan,China
Delivery Time : 30T1
Product Description
# # Cold or Hot Runner Precision Plastic Mold for Construction Industry
# Parts Material:Plastic injection molding grade, such as PE, PVC ABS, PC, PP, POM, PA6( PA66, GF filled), PMMA, PET(PBT).
# Cav.& Cor. Material:P20, H13,S136, NAK80, 718, 2738, 2316, SKD61 etc;
# Mold Base:LKM, DME, HASCO or Customize according to customers' requirements;
# Cavity quantity:1*1, 1+1, 1*2, 1+1+1, etc.
# Shot Runner:Cold or Hot Runner_ HASCO/DME/YUDO etc.
# Mold lifetime:100K to 1500k shots or
Physical Specification
Other Specification :
# # Cold Or Hot Runner Precision Plastic Mold For Construction Industry
# Parts Material:Plastic Injection Molding Grade, Such As PE, PVC ABS, PC, PP, POM, PA6( PA66, GF Filled), PMMA, PET(PBT).
# Cav.& Cor. Material:P20, H13,S136, NAK80, 718, 2738, 2316, SKD61 Etc;
# Mold Base:LKM, DME, HASCO Or Customize According To Customers' Requirements;
# Cavity Quantity:1*1, 1+1, 1*2, 1+1+1, Etc.
# Shot Runner:Cold Or Hot Runner_ HASCO/DME/YUDO Etc.
# Mold Lifetime:100K To 1500k Shots Or According To Customers Quantity Condition To Decide It With Saving Cost For Our Customers.
# Soft Wares: CAD/CAM/CAE, UG, Pro/E, Powmill, Solid Works Etc.
Applications:
This Product Will Be Widely Used On The Construction Industry, It Is A Personal Protection Equipment, Usually Used For High Sky Building Working.
Specifications:
1.CommunicationCustomer Technical RepresentativeContent RequirementDesign People. CommunicationMold UserUse And MaintenceDesign People. CommunicationCustomer Project
2.DesigningDesign Based On New Mold Confirmation, And Confirm With The Customer
3.purchasing And Processingpurchase Accirding To Material Sheet, Process And Assemble According To 2D/3D Drawings, Dimensional Test Of All Parts To Ensure A Correct Match With The Drawing
4.Authenticationtrial Production According To Designed Machine Model And Mold Flow Analysis,organize 3rd-party Review, Provide With The Customers Satisfied Products/molds At Earliest Time.
5.based On The Above 4 Steps, Set Up A Project Team And Assign A Project Manager And A Project Director To Follow Up The Case.
<1>.project Manager: To Follow Up The Project And To Communicate With Customer
<2>.project Director: Ensure Development Of The Mold And The Quality From Technical Point Of View.
Competitive Advantage:
1- 15 Years OEM And ODM Experience