Place of Origin : Laiwu,China
Delivery Terms : FOB, CIF
Delivery Time : 100days
Payment Terms : L/C, T/T
The ever-expanding oil and gas pipeline network around the world is nowadays mainly built by using plastic coated steel pipes because the plastic coating gives great life expectancy and superior mechanical and corrosive resistance to the pipe. Steel pipe 3PE anticorrosive coating line is a multi-layer system that integrates FBE in North America and PE layer in Europe.
3PE anti-corrosion coating production line can be used for anti-corrosion purpose with single-layer FBE, double-layer (adh