Black Cuffed Knitted Beanie Hats with Pom Pom Ball Top and Jacquard Logo - Product
Place of Origin : Shenzhen,China
Delivery Time : 15-30 Days Depends On Quantity
Product Description
Black Cuffed Knitted Beanie Hats with Pom Pom Ball Top and Jacquard Logo
Quick Details:
# Knitted beanie hat
# Cuffed
# Pom pom
# Jacquard
# Cotton or Acrylic
# Classic black/white contrasting design
# Black/white pompom
# Personalized design/logo/label acceptable well
Advantages:
- Low minimum quantity start
- Luxury quality & affordable price
- One-stop service (design, sample, production, packing way, shipping, after-sale, etc)
Physical Specification
Other Specification :
Black Cuffed Knitted Beanie Hats With Pom Pom Ball Top And Jacquard Logo
Quick Details:
# Knitted Beanie Hat
# Cuffed
# Pom Pom
# Jacquard
# Cotton Or Acrylic
# Classic Black/white Contrasting Design
# Black/white Pompom
# Personalized Design/logo/label Acceptable Well
Advantages:
- Low Minimum Quantity Start
- Luxury Quality & Affordable Price
- One-stop Service (design, Sample, Production, Packing Way, Shipping, After-sale, Etc)
Specification:
- - - -
Style | Knitted Beanie Hats |
Material | 100% Acrylic |
Color | Black.white |
Size | Adult Unisex, One Size Fits All |
Brim | Cuffed |
Crown | Knitted Round Sewn With Ball |
Pom Pom | White Black Self-material Pom Pom On Top |
Embellishment | Jacquard Logo |
Label/sticker/hangtag | Available |
OEM | Personalized Design/logo/label Acceptable Well |
- - - -
How To Have The Knitted Beanie Hats That I Want?
# Style (our Design Or Your Design/idea/sample)
# Colorway (specified, Or Pantone/PMS Reference)
# Logo Embellishment With Size And Placement Instruction
# Size & Closure (options As Below)
Size: 18x20 / 20x20 / 22x26CM, Etc, Customized
FAQ
- MOQ?
100pc Per Style*color Usually.
- Price?
It Varies Mainly With Quantity & Logo Embellishment Cost, So It Is Appreciated If Logo Artwork
Offered Before Exact Pricing. EXW / FOB / CNF / CIF Or Door-to-Door Is Acceptable Well.
- Time?
Sampling: 4~6 Days Usually For Basic Style And Stock Fabric. It Takes A Few Days More For Special
Color, Fabric Or Complicated Style.
Mass Production At Different Quantity: 20~35 Days Upon Sample Approval And Deposit Receipt If
Stock Fabric Used; 35-45 Days For Special Dye Fabric.
If