Place of Origin : Dong Guan,China
Delivery Time : 60
Capacity:0.5 m³ to 2.65 m³(Customizable)
High Vacuum Level (mbar):5.0×10-7
No-load Vacuum Level (mbar):5.0×10-7(Room temperature)
Vacuum Cube Leak Rate:1×10-9std/cc/sec
Pressure Regulation in
Multiple Ranges (mbar/Torr):Adjustable
Temperature Range: -190°C(LN2 cooling) to 150°C
Temperature Uniformity:±2?
Main Components And Functions:
The Vacuum System Is Composed Of Components Such As Vacuum Pumps, Gas Condensers, And Pressure Sensors. The Vacuum Pump Is Responsible For Extracting The Gas From The Vacuum Chamber. The Gas Condenser Cools And Liquefies The Extracted Gas To Reduce Damage To The Vacuum Pump. The Pressure Sensor Monitors The Pressure In The Vacuum Chamber And Provides Feedback Signals To The Measurement And Control System.
Vacuuming Process:
In Actual Operation, The Vacuum Chamber Is Typically Evacuated Using A Combination Of Main Pumps And Molecular Pumps. The First Vacuum Stage (primary Or Initial Vacuuming) Is Performed By A Dry Pump, Which Can Convert The Environment Pressure To Approximately 10-2 Millibars In A Short Period Of Time And Eliminates The Risk Of Oil Return, Resulting In Low Maintenance Costs; The Second Stage Uses A More Complex Pump (low-temperature Pump), Which Can Achieve High Vacuum And High Reliability Performance.If You Need More Models About Our Test Equipment, Please Reference Our Chamber-testing(point)com