Place of Origin : Chongqing,China
Delivery Terms : FOBShenzhen
Delivery Time : Within 15 Working Days
Product Capacity : 10000pcs Per Month
Payment Terms : T/T
Especially developed for indication and supervision of the three-phase circuit, replaces an analogical ammeter, reducing installation manpower and optimizing the used one of spaces in the panel.
Ideal for protection of three-phase networks is monitored and generally to own alarm superior and inferior. Protection of the parameters of programming by password.
Current inputs (TRMS)
CT primary 10 000 A
CT secondary 1 and 5 A
Sampling Rate 2 per sec