Place of Origin : Rizhao,China
Delivery Terms : FOB CIF
Delivery Time : 15DAYS
Product Capacity : 5000M/T
Payment Terms : L/C T/T
Main material is steel frame with color metal pressure plate, due to its frame structure is given priority to with the door frame, therefore, its construction performance is based on the door frame for datingOverall, the prefabricated steel structure buildings with simple and lively characteristics recognised by the social from all walks of life.