Place of Origin : Nanyang,China
Foam concrete filling project for the 1st stage of South to North Water Diversion Middle Route
Required dry density of foam concrete: 580kg per cubic meterfor the top 0.8m; 515kg each cubic meter for the left parts;
Compressive strength: ≥ 1.2Mpa for the top 0.8m
≥ 0.8Mpa for the left parts